2026 Road Rehabilitation Program
Project Information
The work to be performed consists of storm sewer improvements, curb and gutter removal and replacement, sidewalk removal and replacement, asphalt surface removal, pavement base patching, base stabilization, asphalt leveling binder, asphalt surface course, pavement markings, and parkway restoration.
| Tentative Start Date: | TBD |
| Tentative Completion Date: | Fall of 2026 |
| Bid Opening: | TBD |
| Project Manager: | Brad Valentino, Street Superintendent |
| Contractor: | Brothers Asphalt Paving, Inc. |
| Awarded Contract Amount: | TBD |
| Funding Source: | MFT, Local Roads, and Utility Fund |
Construction Limits
Street Name | From | To | Length (ft) | Rehab Method |
Algonquin Parkway (West) | IL-62 | Terminus | 1215 | Resurfacing |
Algonquin Parkway (East) | Weber Drive | Terminus | 270 | Resurfacing |
Blackhawk Drive | Rohlwing Road | Terminus | 615 | Resurfacing |
Chapman Court | Kirchoff Road | Terminus | 620 | Resurfacing |
Crane Court | Dove Street | Terminus | 365 | Resurfacing |
George Court | Meadow Drive | Terminus | 380 | Resurfacing |
Kingfisher Lane | E. Frontage Road | Owl Drive | 930 | Resurfacing |
Oaksbury Lane | Corporate Limits | Terminus | 1400 | Resurfacing |
Oaksbury Court | Oaksbury Lane | Terminus | 650 | Resurfacing |
Raven Lane | Fulle Street | Grouse Lane | 960 | Resurfacing |
Rhiannon Court | Brockway Street | Terminus | 305 | Resurfacing |
School Drive | Meadow Drive | Campbell Street | 1560 | Resurfacing |
Sigwalt Court | Sigwalt Street | Terminus | 220 | Resurfacing |
Sigwalt Street | School Drive | Meadow Drive | 940 | Resurfacing |
Williamsburg Court | Chapman Court | Terminus | 550 | Resurfacing |
Library Parking Lot (West) | Library Road | Pheasant Drive | 960 | Resurfacing |
Resurfacing Subtotal | 11,940 | 2.26 mi | ||
Tollview Drive | IL-62 | Newport Drive | 2,200 | Reconstruction |
Teonia Woods Drive | Meacham Road | Terminus | 1,270 | Reconstruction |
Reconstruction Subtotal | 3,470 | 0.66 mi | ||
2026 Street Rehabilitation Program Total | 15,410 | 2.92 mi | ||
Anticipated Hours of Work:
7:00 a.m.–6:00 p.m. Mon–Fri; 8:00 a.m.–5:00 p.m. Sat. (If necessary)
FAQS
HOW WILL I KNOW WHEN I WILL BE AFFECTED BY CONSTRUCTION?
This project is scheduled to begin on or about May 1, 2023. Residents will receive construction notices in advance of each stage of construction.
WILL I HAVE ACCESS TO MY DRIVEWAY?
Residents should expect to be displaced from their driveways for 5-7 days during the concrete improvements phase of the project (curb and sidewalk removal and replacement). Residents displaced from their driveways will receive on-street parking permits along with the construction notices. These notices may include specific instructions on where to park your vehicle. Generally, on-street parking within the construction zone will be prohibited from 6:30am to 6pm.
WHAT IF I HAVE SPECIAL ACCESS REQUIREMENTS?
Residents should contact the City of Rolling Meadows Public Works Department at (847) 963-0500. The City will do its best to accommodate residents with specific special needs so long as we are informed in advance and can coordinate with the Contractor.
WILL MY WATER BE SHUT OFF?
No, there are no municipal water system improvements proposed for this project. Should the water need to be shut-off for any reason due to construction, notification will be provided in advance.
WILL MY GARBAGE BE PICKED UP?
Yes, your scheduled weekly pickup for garbage and recycling will be maintained. Please have containers ready for pickup prior to 6:30am.
WILL I RECEIVE MAIL DURING THE COURSE OF CONSTRUCTION?
Yes, mail delivery will not be affected during construction.
HOW LONG WILL THIS PROCESS TAKE TO COMPLETE?
The project is expected to be substantially complete by early September.
PLEASE BE PATIENT
There will be noise, dust, and periodic inconveniences. Please use caution when in an around the construction site. Thank you in advance for your patience as we work together to deliver a safe and successful project.
IF YOU HAVE ANY QUESTIONS OR CONCERNS, DO NOT HESITATE TO CONTACT THE ROLLING MEADOWS PUBLIC WORKS DEPARTMENT AT (847) 963-0500 ext 7036
Weekly Project Updates:
Contact Us
-
Aaron Grosskopf
Public Works Director
Public Works Department
3900 Berdnick Street
Rolling Meadows, IL 60008
Email the Department
Phone: 847-963-0500
Fax: 847-963-0555
Hours
Monday - Friday
7:00 a.m. - 3:30 p.m.
Recycling Center
3200 Central Road
Rolling Meadows, IL 60008
Hours
Open 24/7